Plans for September 2022

In this month we plan to complete the modelling for the main school building, at this time only the final roof element and ground-level stairways are in need of completion. Colouring of the school building has resulted in a better result that originally anticipated so only minor post-production touches will be needed to make screenshots taken around the school look convincing.

Three more buildings at the minimum are needed to ensure visual consistency in the backgrounds but 3D modelling will take a pause until the first draft of the script and initial character designs are completed.

In simple terms September will be dedicated to finishing the main school building and writing as much of the script as possible.